Dundee's Trusted Bathroom Specialists — Over 15 Years Experience01382 761002

    Our Bathroom Design & Installation Process

    From the first phone call to handing you the keys to your finished bathroom — every stage explained, with realistic timings and what we deliver at each step.

    Step 1

    Free Consultation

    Call us or fill in our form for a free, no-obligation consultation at your home in Dundee.

    Step 2

    Design & Quote

    Our expert bathroom designer creates a bespoke plan tailored to your space, style, and budget.

    Step 3

    Expert Installation

    Our experienced bathroom fitters handle everything — plumbing, electrics, tiling, and joinery.

    Step 4

    Your Dream Bathroom

    Sit back and enjoy your stunning new bathroom. We guarantee quality craftsmanship that lasts.

    The Full 8-Stage Process

    Most bathroom projects with us run 2–3 weeks on site, with 2–4 weeks of design and ordering beforehand.

    1

    Free Home Consultation

    Day 1 of your project journey

    A designer visits your home in Dundee to measure the room precisely, look at sightlines, light, plumbing positions and floor build-up. We talk through how you actually use a bathroom, your style preferences and your realistic budget. Bring images you like — Pinterest, Instagram, magazine pages — they help us understand your taste.

    What you get: Layout sketches on the day, a clear specification list, and an honest steer on what your budget will actually buy.

    2

    Bespoke Design & Fixed-Price Quote

    Within 48 hours of the consultation

    Back at the office we work up the design, source the suite, brassware and tiles from our supplier network, and price the whole project line-by-line. You receive a fully itemised, written, fixed-price quote covering labour, materials, certificates, waste removal and warranty.

    What you get: A real quote you can act on — not a vague estimate. We'll happily revise the spec to suit different budgets.

    3

    Confirm Start Date & Order Materials

    2–4 weeks before installation

    Once you accept the quote, we book the start date and order every item so it's on site before work begins. This is the single biggest difference between projects that run on time and those that don't — we never start without materials in hand.

    What you get: A confirmed start date, a day-by-day schedule, and a single project manager for the duration of the work.

    4

    Strip-Out & First-Fix

    Days 1–5 of installation

    The old bathroom comes out. Waste leaves site the same day. First-fix plumbing and electrics are run while walls and floors are exposed. We protect the rest of your home with dust sheets, floor protection and zip walls to contain dust.

    What you get: A clean shell ready for waterproofing and tiling, with all the hidden work that determines how long your bathroom lasts.

    5

    Walls, Floors & Waterproofing

    Days 3–7

    Plasterboard goes up. Floors prepared. Waterproof tanking applied and flood-tested in wet zones (essential in wet rooms, recommended in showers). Underfloor heating mats laid. Self-levelling compound where needed.

    What you get: A correctly built and fully waterproofed substrate — the layer you never see but the one that protects your home for decades.

    6

    Tiling

    Days 5–10

    Floor tiles first, then walls. Every tile dry-laid to plan cuts before adhesive goes down. Full tiles in the most visible places, cuts where they won't be seen. Joints set out to line through wall, floor and the shower niche where possible. Grouted and silicone-finished.

    What you get: A tiled bathroom that reads as one cohesive piece of work, not a patchwork of compromises.

    7

    Second-Fix & Suite Installation

    Days 9–13

    Bath, shower, basin, WC, taps, towel rail. Electrics commissioned and tested. Mirror, vanity unit, accessories. Paintwork, skirting and trim. Final silicone work to wet edges.

    What you get: A fully working bathroom — water on, lights working, every fitting installed properly with backing plates and quality fixings.

    8

    Snag, Clean & Handover

    Day 14 (or final day)

    We snag the whole bathroom against our own detailed checklist. Anything not right gets put right before we leave. Deep clean. Walk-through with you covering care instructions for tiles, brassware and electrical items. All warranty paperwork and certificates handed over.

    What you get: A bathroom that's finished, signed off, and ready to enjoy — with a 12-month workmanship warranty in writing.

    Ready to start your project?

    Book your free design consultation — no obligation, no pressure, just an honest conversation about what your bathroom could be.

    Book Free Consultation

    Ready to Transform Your Bathroom?

    Get a free, no-obligation quote from Dundee's trusted bathroom specialists. Call us today or fill in our quick form.

    Call NowVery Quick Quote
    Very Quick Quote